Weapons
STM Bridging System
- Details
- Created: 12 October 2006
- Written by Super User
- Hits: 10015
SARVATRA TRUCK-MOUNTED BRIDGING SYSTEMSarvatra Truck-Mounted Bridging SystemLength: 15-20 metres span. Width: 4 metres - fully decked. Multi-span Capacity: Up to 100 units. Load Class: MLC-70. Pier Height: 2.5 to 6.0 meters. Chassis: Tatra (8x8). Construction Time: 15 to 20 minutes per span. Comments: DRDO has developed a wheel based universal bridging system to overcome obstacles or varied nature at remote/hostile locations, capable of carrying MLC-70 traffic. It features state of the art trestle-cum-span bridge. A single span bridge can cover a width of 15 to 20 meters and a multi-span bridge can cover upto 100 meters, providing a roadway of 4 meters. The bridge could be launched/recovered from either end in 15 to 20 minutes. |